Dometic B3351.531 Operations Instructions Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 11
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
4
INSTALLATION AND OPERATING INSTRUCTIONS
PRECAUTIONS
INSTALLATION INSTRUCTIONS
Improper installation may damage equip-
ment, could endanger life, cause serious
injury and/or property damage.
WARNING
!
A. Read installation and operating instructions carefully
before attempting to start your air conditioner installa-
tion.
B. Dometic Corporation will not be liable for any damages
or injury incurred due to failure in following these instruc-
tions.
C. Installation must comply with the National Electrical
Code and any Region or Local Codes or regulations.
D. DO NOT add any devices or accessories to this air
conditioner except those specifically authorized by
Dometic.
E. This equipment must be serviced by qualified personnel
and some regions require these people to be licensed.
CHOOSING LOCATION FOR THE
AIR CONDITIONER
This air conditioner is specifically designed for installation on
the roof of a recreational vehicle (RV).
It is the responsibility of the installer of this
air conditioner/heat pump system to ensure
structural integrity of the RV roof. Never cre-
ate a low spot on the roof where water will
collect. Water standing around the air con-
ditioner/heat pump may leak into the interior
causing damage to the product and the RV.
CAUTION
A. NORMAL LOCATIONS:
The air conditioner is designed to fit over an existing roof
vent opening. When the vent is removed, it normally
creates a 360mm x 360mm opening.
B. OTHER LOCATIONS:
When no roof vent is available or another location is
desired, the following is recommended:
1. For one unit installation: The air conditioner should
be mounted slightly forward of center (front to back)
and centered from side to side. See FIG. 1.
FIG. 2
L
2/3 L
1/3 L
It is preferred that this air conditioner be installed in a
relatively flat and level roof section measured with the RV
parked on a level surface; however, up to 15
o
slant to
either side, or front-to-back, is acceptable.
C. AFTER LOCATION SELECTION:
1. Check for obstructions in the area where air condi-
tioner will be installed. See FIG. 4.
2. The roof must be designed to support 60 Kg. when
the RV is in motion. Normally a 90 Kg. static load
design will meet this requirement.
c. Check inside the RV for air box obstructions. (i.e.
door openings, room dividers, curtains, ceiling fix-
tures, etc.) See FIG. 3.
871mm
325mm
750mm
510mm
570mm
60mm
FIG. 3
FIG. 1
1/2 L
L
2. For two unit installations: Install one air conditioners
1/3 and one air conditioner 2/3's from front of RV and
centered from side to side. See FIG. 2.
Page view 3
1 2 3 4 5 6 7 8 9 10 11

Comments to this Manuals

No comments